Referans Göktürk will be the most special living space of Istanbul with the oxygen tank North Forests right next to it, many special locations nearby, particularly the Istanbul Airport, its distinctive low-rise architecture and numerous privileges. As a location where you can reach Istanbul Airport, Turkey’s largest airport project that makes a splash in the world, and to the most decent schools of our country in minutes, and where you can enjoy many elite sports from golf to horse riding and tennis, Göktürk always hosts the most special lives. Floor gardens, private terrace pools, large, detached terraces nested with green, garden floors opening directly to the pool and numerous other privileges. Everyone has a special place for own in Referans Göktürk. Simplex, roof duplex or garden duplex… You can choose the one you want in line with your needs. The common point of all alternatives is a perfect life where you will feel your specialty.
There are 182 residential units in total. There are 63 units of 2+1, 72 units of 3+1/3.5+1, and 47 units of 4+1/4.5+1. There are 16 units in blocks A-B-C, 21 units in block D, 22 units in block E, 27 units in block F, 24 units in block G, and 20 units in blocks H and I. There are an average of 4 units on each floor. Each apartment will have a private parking space. There is access from the parking lots to the lobbies of each block.
Special sound insulation materials will be used in walls adjacent to elevators and stairwell enclosure walls. Walls between units will be constructed as double walls with special insulation material between them to provide both sound and thermal insulation. Between floors, special insulated material will be used in the floor layers to provide sound and thermal insulation. The social facilities include an indoor swimming pool (365m2), a fitness center (125m2), a yoga/pilates studio (74m2), a lounge area (110m2), a children’s playground, saunas, and steam rooms. Homeowners will be able to use the facilities as part of their maintenance fee. The fee will be determined by the site management in accordance with the current conditions and the needs of the site.
The estimated completion of the Project is August 2025.